Causes of Low-Skilled Workers’ Performance in Construction Projects

Alhaji Ali Zannah, Aryani Ahmad Latiffi, Abdulazeez Umar Raji, Abdullahi Abba Waziri, Usman Mohammed

Abstract

Skilled workers’ performance is one of the crucial aspects of labour productivity that requires proper attention for effective projects delivery in the construction industry. The level of skilled workers’ low performance has been seen to be a major factor which contributes toward inefficient construction projects productivity. Therefore, the objective of this research is to identify the causes of low-skilled workers’ performance in construction projects in the Nigeria. The objective was achieved through a structured quantitative method of questionnaire distributed to 150 respondents that comprise of active stakeholders in the Nigerian construction industry. 111 responses representing 74 % were retrieved. The data were analysed using descriptive statistics and analysis of variance (ANOVA). The finding shows that; low wages of skilled, lack of sufficient skill acquisition centres and lack of incentive schemes for skilled workers were the most significant causes of low-skilled workers’ performance in the Nigerian construction industry. The homogenous analysis indicates that there are significant differences in perception of respondents on few variables whereas majority of respondents have similarities in most of the variables. The research findings indicate the need for stakeholders in the Nigerian construction industry to provide incentives and motivate skilled workers, provide training and retraining, conducive working condition, supply of quality materials and equipment, and proper site management in order improve low-skilled workers’ performance in Nigerian construction industry towards optimal performance.



Keywords


project performance; skilled workers; construction industry

Full Text:

PDF


References


1. Abdullah, A., Mohandes, S., Hamid, A., & Singh, B. (2016). The Practices of Corporate Social Responsibility among Construction Companies in Malaysia. Research Journal of Applied Sciences, Engineering and Technology, 2(7), 742–755.

[Google Scholar] [CrossRef]

2. Abdulsalam, D., Faki, A. I. , & Dardau, A. A. (2012). Impact Assessment of Incentive Schemes for the Sustainable Development of Nigerian Construction Industry. Journal of Civil Engineering and Architecture, 6(9), 1194–1201.

[Google Scholar]

3. Adamu, K. J., Dzasu, W. E., Haruna, A., & Balla, S. K. (2011). Labour productivity constraints in the Nigerian construction industry. Continental Journal of Environmental Design and Management, 1(2), 9–13.

[Google Scholar]

4. Adedokun, O. A., Ibironke, O. T., & Olanipekun, A. O. (2013). Vulnerability of motivation schemes in enhancing site workers productivity for construction industry’s sustainability in Nigeria. International Journal of Sustainable Construction Engineering and Technology, 4(1), 21–30.

[Google Scholar]

5. Adewale, P. O., Siyanbola, A. B., & Siyanbola, S. O. (2014). Building craftsmanship skill development and Nigeria’s vision 20: 2020: Imperatives and daunting challenges. International Journal of Vocational and Technical Education, 6(4), 36–42.

[Google Scholar]

6. Aibinu, A. A. , & Jagboro, G. O. (2002). The effects of construction delays on project delivery in Nigerian construction industry. International Journal of Project Management, 20(8), 593–559.

[Google Scholar] [CrossRef]

7. Aina, O. O., & Adesanya, D. A. (2015). Factors affecting performance of incentive schemes in the construction industry in Nigeria. Civil and Environmental Research, 8(7), 81-89.

8. Aiyetan, A. O., & Olotuah, A. O. (2006). Impact of motivation on workers’ productivity in the Nigerian construction industry. In D. Boyd (Ed.), Proceedings 22nd Annual ARCOM Conference, 4–6 September 2006, Birmingham (UK), Association of Researchers in Construction Management (pp. 239–248). Retrieved from http://www.arcom.ac.uk/-docs/proceedings/ar2006-0239-0248_Aiyetan_and_Olotuah.pdf

[Google Scholar]

9. Akinsiku, O. E., & Akinsulire, A. (2012). Stakeholders’ perception of the causes and effects of construction delays on project delivery. Journal of Construction Engineering and Project Management, 2(4), 25–31.

[Google Scholar] [CrossRef]

10. Alinaitwe, H., Mwakali, J., & Hansson, B. (2006). Factors Affecting Productivity of Building Craftsmen A Case of Uganda. In Proceedings from the International Conference on Advances in Engineering and Technology (pp. 277–284).

[Google Scholar] [CrossRef]

11. Almutairi, Y., Arif, M., & Khalfan, M. (2016). Moving towards managing offsite construction techniques in the Kingdom of Saudi Arabia: a review. Middle East Journal of Management, 3(2), 164–178.

[Google Scholar] [CrossRef]

12. Ameh, O. J. , & Shokumbi, B. B. (2013). Effectiveness of non-financial motivational scheme on construction workers output in Nigeria. Ethiopian Journal of Environmental Studies and Management, 6(3), 263-72.

[Google Scholar] [CrossRef]

13. Aniekwu, N., & Ozochi, C. (2010). Restructuring education, training and human-resource development in the Nigerian construction industry. International Journal of Science and Technology Education Research, 1(5), 92-98.

[Google Scholar]

14. Arshad, M. N., & Ab Malik, Z. (2015). Quality of human capital and labour productivity: A Case of Malaysia. International Journal of Economics, Management and Accounting, 23(1), 37–55.

[Google Scholar]

15. Attar, A. A., Gupta, A. K., & Desai, D. B. (2012). A study of various factors affecting labour productivity and methods to improve it. IOSR Journal of Mechanical and Civil Engineering, 1(3), 11-14.

[Google Scholar]

16. Bernardin, H. J., Kane, J. S., & Wiatrowski, M. (1995). Performance appraisal. In N. Brewer & C. Wilson (Eds.), Psychology and Policing (pp. 257–289). Hillsdale: Lawrence Erlbaum Associates.

[Google Scholar]

17. Bheemaiah, K., & Smith, M. J. (2015, June 2). Inequality, Technology and Job Polarization of the Youth Labour Market in Europe.

[Google Scholar] [CrossRef]

18. Bilau, A. A., Ajagbe, A. M., Kigbu, H. H., & Sholanke, A. B. (2015). Review of shortage of skilled craftsmen in small and medium construction firms in Nigeria. Journal of Environment and Earth Science, 5(15), 5–12.

[Google Scholar]

19. Brockman, J. (2012, December). The Cost of Interpersonal Conflicts in Construction. Retrieved from http://www.cpwr.com/sites/default/files/publications/brockmancostofconflict.pdf

[Google Scholar]

20. Chandra, H. P. (2015). Initial investigation for potential motivators to achieve sustainable construction safety and health. Procedia Engineering, 125, 103–108.

[Google Scholar] [CrossRef]

21. Chandrasekar, K. (2011). Workplace environment and its impact on organisational performance in public sector organisations. International Journal of Enterprise Computing and Business Systems, 1(1), 1-19.

[Google Scholar]

22. Cox, R. F., Issa, R. R., & Frey, A. (2006). Proposed Subcontractor-Based Employee Motivational Model. Journal of Construction Engineering and Management, 132(2), 152–163.

[Google Scholar] [CrossRef]

23. Danso, H. (2014). Poor Workmanship and Lack of Plant/Equipment Problems in the Construction Industry in Kumasi, Ghana. International Journal of Management Research, 2(3), 60–70.

[Google Scholar]

24. Davenport, T. H. (2008). Thinking for a living: how to get better performances and results from knowledge workers. Boston: Harvard Business Press.

[Google Scholar]

25. Doloi, H., Sawhney, A., Iyer, K. C., & Rentala, S. (2012). Analysing factors affecting delays in Indian construction projects. International Journal of Project Management, 30(4), 479–489.

[Google Scholar] [CrossRef]

26. Enshassi, A., Mohamed, S., Mustafa, Z. A., & Mayer, P. E. (2007). Factors affecting labour productivity in building projects in the Gaza Strip. Journal of Civil Engineering and Management, 13(4), 245–254.

[Google Scholar]

27. Funso, A., Sammy, L., & Gerryshom, M. (2016). Application of Motivation in Nigeria Construction Industry: Factor Analysis Approach. International Journal of Economics and Finance, 8(5), 271–276.

[Google Scholar] [CrossRef]

28. Garcés‐Mascareñas, B. (2015). Revisiting bordering practices: Irregular migration, borders, and citizenship in Malaysia. International Political Sociology, 9(2), 128–142.

[Google Scholar] [CrossRef]

29. Ghoddousi, P., Poorafshar, O., Chileshe, N., & Hosseini, M. R. (2015). Labour productivity in Iranian construction projects: Perceptions of chief executive officers. International Journal of Productivity and Performance Management, 64(6), 811–830.

[Google Scholar] [CrossRef]

30. Griggs, T. L., Eby, L. T., Maupin, C. K., Conley, K. M., Williamson, R. L., Griek, O. H., & Clauson, M. G. (2016). Who Are These Workers, Anyway? Industrial and Organizational Psychology, 9(1), 114–121.

[Google Scholar] [CrossRef]

31. Hershcovis, M. S., Barling, J. (2010). Towards a multi-foci approach to workplace aggression: A meta-analytic review of outcomes from different perpetrators. Journal of Organizational Behavior, 31(1), 24–44.

[Google Scholar] [CrossRef]

32. Hickson, B. G., & Ellis, L. A. (2014). Factors affecting construction labour productivity in Trinidad and Tobago. The Journal of the Association of Professional Engineers of Trinidad and Tobago, 42(1), 4–11.

[Google Scholar]

33. Hughes, P., & Ferrett, E. (2016). Introduction to Health and Safety in Construction: for the NEBOSH National Certificate in Construction Health and Safety (5th ed.). Abingdon; New York: Routledge.

[Google Scholar]

34. Husseini, A. A. (1992). The importance of manpower training and management to the construction industry. In Proceedings of National Seminar on Effective Contract Management in the Construction Industry, Ikeja, August 22–23, 1991 (pp. 119–131). Lagos: Nigerian Institute of Building.

[Google Scholar]

35. Hyder, M. B. (2016). Vulnerability, sustainable livelihoods and workers' rights: a case study of construction workers in Dhaka, Bangladesh (Master's thesis). Retrieved from https://brage.bibsys.no/xmlui/handle/11250/2398839

[Google Scholar]

36. Ibrahim, M. (2013). Contractors perspective toward factors affecting labour productivity in building construction. Engineering, Construction and Architectural Management, 20(5), 446-60.

[Google Scholar] [CrossRef]

37. Ikediashi, D. I., Ogunlana, S. O., Awodele, O. A., & Okwuashi, O. (2012). An evaluation of personnel training policies of construction companies in Nigeria. Journal of Human Ecology, 40(3), 229–238.

[Google Scholar]

38. Jarkas, A. M., & Radosavljevic, M. (2013). Motivational factors impacting the productivity of construction master craftsmen in Kuwait. Journal of Management in Engineering, 29(4), 446-454.

[Google Scholar] [CrossRef]

39. Kamar, K. A., Azman, M. N. , & Nawi, M. N. (2014). IBS Survey 2010: Drivers, Barriers and the Critical Success Factors in Adopting Industrialised Building System (IBS) Construction by G7 Contractors in Malaysia. Journal of Engineering Science & Technology, 9(5), 490–501.

[Google Scholar]

40. Kaming, P. (1997). Factors influencing craftsmen's productivity in Indonesia. International Journal of Project Management, 15(1), 21-30.

[Google Scholar] [CrossRef]

41. Kazaz, A., Manisali, E., & Ulubeyli, S. (2008). Effect of basic motivational factors on construction workforce productivity in Turkey. Journal of Civil Engineering and Management, 14(2), 95–106.

[Google Scholar] [CrossRef]

42. Kuroshi, P. A., Lawal, M. (2014). Study of internal factors affecting labour productivity in medium sized construction firms in Nigeria. International Journal of Education and Research, 2(12), 83–92.

[Google Scholar]

43. Liepmann, K. (1960). Apprenticeship: An Enquiry into Its Adequacy under Modern Conditions. London: Routledge.

[Google Scholar]

44. Ling, Y. Y., & Tan, F. (2015). Selection of site supervisors to optimize construction project outcomes. Structural Survey, 33(4/5), 407-422.

[Google Scholar] [CrossRef]

45. Modular Building Institute. (2010). Improving efficiency and productivity with modular construction. Retrieved from http://www.modular.org/marketing/documents/Whitepaper_ImprovingConstructionEfficiency.pdf

46. Moselhi, O., Assem, I., & El-Rayes, K. (2005). Change orders impact on labour productivity. Journal of Construction Engineering and Management, 131(3), 354–359.

[Google Scholar] [CrossRef]

47. Naoum, S. G. (2016). Factors influencing labor productivity on construction sites: A state-of-the-art literature review and a survey. International Journal of Productivity and Performance Management, 65(3), 401-421.

[Google Scholar] [CrossRef]

48. Odesola, I. A, Otali, M., & Ikediashi, D. I. (2013). Effects of project-related factors on construction labour productivity in Bayelsa State of Nigeria. Ethiopian Journal of Environmental Studies and Management, 6(2), 817–819.

[Google Scholar] [CrossRef]

49. Odesola, I. A. (2015). Assessment of Management-Related Factors Affecting Construction Labour Productivity in Cross River State of Nigeria. Covenant Journal of Research in the Built Environment, 3(2), 13–29.

[Google Scholar]

50. Odia, L. O, & Omofonmwan, S. I. (2007). Educational system in Nigeria problems and prospects. Journal of Social Sciences, 14(1), 81–86.

[Google Scholar]

51. Offei–Nyako, K., Osei–Tutu, E., Fugar, F. D., & Adinyira, E. (2013). Skilled artisanal availability in the Ghanaian construction industry. Covenant Journal of Research in the Built Environment, 1(1), 1–9.

[Google Scholar]

52. Ogochukwu, O. C. (2014). Evaluating the Impact of Construction Crafts’ Skills Acquisition and Critical Knowledge Development on Project Performance in Nigeria (Doctoral thesis). Retrieved from http://my.unizik.edu.ng/postgraduate/dload2.php?downloads=976

53. Ogwu, B. (2015). Nigeria: Technical, Vocational Education and Training. In E. Takyi-Amoako (Ed.), Education in West Africa (Chapter 23). London: Bloomsbury Publishing.

[Google Scholar]

54. Okafor, N. (2010). Funding the Rehabilitation of Universities. The Alumnus Special Millennium Education Journal, 1, 55–56.

55. Olateju, B. (1992). Enhancing the contract management capabilities of the indigenous contractors. In Proceedings of National Seminar on Effective Contract Management in the Construction Industry, Ikeja, August 22–23, 1991 (pp. 132–143). Lagos: Nigerian Institute of Building.

[Google Scholar]

56. Olatunji, O. A, Aje, O. I, Odugboye, F. (2007). Evaluating health and safety performance of Nigerian construction site. Retrieved from https://www.irbnet.de/daten/iconda/CIB4786.pdf

[Google Scholar]

57. Olubodun, O. (1985). Low productivity of the Nigerian construction workers. In Report No. Unpublished Seminar Paper, Building Department, OAU, Ile-Ife.

[Google Scholar]

58. Oni, C. S. (2007). Globalization and Its Implication for Vocational Education in Nigeria. Essays in Education, 21(1), 30.

[Google Scholar]

59. Oseghale, B. O, Abiola-Falemu, J. O., & Oseghale, G. E. (2015). An Evaluation of Skilled Labour shortage in selected construction firms in Edo state, Nigeria. American Journal of Engineering Research, 1(4), 156–167.

[Google Scholar]

60. Parida, R., Sarkar, S., & Ray, P. (2016). Selection of Alternate Work Systems to Improve Occupational Health of Indian Construction Workers: A Design of Experiment-Based Approach. In P. Mandal & J. Vong (Eds.), Smart Technologies for Smart Nations (pp. 155–173). Singapore: Springer Singapore.

[Google Scholar] [CrossRef]

61. Rojas, V. M., & Kleiner, B. H. (2000). The Art and Science of Effective Stress Management. Management Research News, 23(7/8), 103–106.

[Google Scholar] [CrossRef]

62. Salisu, J. B., Chinyio, E., & Suresh, S. (2015). The impact of compensation on the job satisfaction of public sector construction workers of jigawa state of Nigeria. The Business & Management Review, 6(4), 282–296.

[Google Scholar]

63. Schwarzkopf, W. (2004). Calculating lost labour productivity in construction claims (2nd ed.). Maryland: Frederick Aspen Publisher.

[Google Scholar]

64. Sheebe, J. (2016). A study on the impact of training programs of Central Board for Workers Education on the quality of work life of the organized, unorganized and rural labour in Kerala. Retrieved from http://www.baselius.ac.in/wp-content/uploads/2017/06/sheeba-1.pdf

[Google Scholar]

65. Sherekar. V., & Tatikonda, M. (2016). Impact of Factor Affecting on Labour Productivity in Construction Projects by AHP Method. International Journal of Engineering Science and Computing, 6(6), 6771–6775.

[Google Scholar]

66. Sinha, P. (2015). Towards higher maintenance effectiveness: Integrating maintenance management with reliability engineering. International Journal of Quality & Reliability Management, 32(7), 754–762.

[Google Scholar] [CrossRef]

67. Sweet, S., & Meiksins, P. (2017). Changing contours of work: Jobs and opportunities in the new economy (3rd ed.). Los Angeles: SAGE.

[Google Scholar]

68. Uchitelle, L. (2009, June 23). Despite Recession, High Demand for Skilled Labor. The New York Times. Retrieved from http://www.nytimes.com/2009/06/24/business/24jobs.html

[Google Scholar]

69. Venugopal, V., Chinnadurai, J., Vennila, V., Ajit, R., Lucas, R., & Kjellstrom, T. (2016). The Social Implications of Occupational Heat Stress on Migrant Workers Engaged in Public Construction: A Case Study from Southern India. The International Journal of the Constructed Environment, 7(2), 25–36.

[Google Scholar] [CrossRef]

70. Wong, J. M., Ng, S. T, & Chan, A. P. (2010). Strategic planning for the sustainable development of the construction industry in Hong Kong. Habitat International, 34(2), 256–263.

[Google Scholar] [CrossRef]

71. Yerramreddy, V. A. (2014). Schedule Quality: Delay Analysis Perspective (Doctoral dissertation). Retrieved from https://repository.tudelft.nl/islandora/object/uuid%3Afd3c938d-2207-41c6-b976-0cb33e441a1e

[Google Scholar]

72. Zhang, L, & Huo, X. (2015). The impact of interpersonal conflict on construction project performance: A moderated mediation study from China. International Journal of Conflict Management, 26(4), 479–498.

[Google Scholar] [CrossRef]

73. Zou, P. X., Zhang, G., & Wang, J. (2007). Understanding the key risks in construction projects in China. International Journal of Project Management, 25(6), 601–614.

[Google Scholar] [CrossRef]


Article Metrics

Metrics Loading ...

Metrics powered by PLOS ALM

Refbacks

  • There are currently no refbacks.




Copyright (c) 2017 Alhaji Ali Zannah, Aryani Ahmad Latiffi, Abdulazeez Umar Raji, Abdullahi Abba Waziri, Usman Mohammed

Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.